An engineering practice has an unusual cost problem: the largest line on the bill is software, and the largest loss never appears on a bill at all. One is a subscription you can see every month. The other is the fourth revision you did not charge for.
SPAN gives an engineer a client record, invoicing and a site-visit calendar in one free account, instead of three paid tools that each hold half the project.
Ask an engineer in Lebanon where the money goes and they will say licences. Ask them how many rounds of revision the last project took and the answer is usually "I lost count" — and that is the real number. A fee quoted for a design that ends up being drawn four times is a fee divided by four.
Scope creep is not a client problem; it is a contract problem. The fix costs nothing and takes one line: state how many revision rounds the fee includes, and what a further round costs. Clients almost never object — they object to being surprised. What they do instead is think harder before the third round, which is the actual saving.
A full CAD and BIM subscription runs well over two thousand dollars a year per seat, and most practices are paying for more seats and more suites than get opened in a given month. The licence that matters is the one a client specifies in the deliverable; the rest is habit.
Three questions usually free up real money. Which deliverables genuinely require that specific file format? Which seats were bought for a hire who has since moved on? And which annual plan renewed quietly because nobody looked at the date? A practice of four engineers can commonly drop one or two seats without a single project noticing.
Plotting large-format drawings is one of the few costs in this profession that has genuinely become optional. Municipal and client submissions that once demanded paper increasingly accept a signed PDF, and the ones that still require paper rarely require every revision in between.
The habit to break is printing to check. A full set plotted at each internal review is a cost repeated across the whole project for a review that a screen handles as well. Print what gets submitted and what gets signed; read the rest.
Fuel is the obvious cost of a site visit and the smaller one. The real cost is the half-day it consumes: an hour each way in Beirut traffic plus the visit itself is most of a working morning, and that morning was billable.
Practices that cluster visits geographically, and that settle questions with a photograph and a phone call where a photograph and a phone call will do, routinely cut site time by a third. The discipline is deciding before you leave what the visit must answer — a trip made to "check how it is going" tends to produce another trip.
A fee paid at completion means financing the client for the length of the project out of your own pocket, in a country where holding dollars idle is itself a decision. On a six-month project that is six months of your costs carried before anything arrives.
Stage payments against deliverables — at concept, at permit submission, at issue for construction — turn one large uncertain payment into three predictable ones, and surface a client who was never going to pay at the first stage rather than the last. The same schedule also stops the final invoice being the moment the relationship becomes awkward.
Alongside the technical software, most practices are also paying for something to hold client contacts, something to issue and track invoices, and something to manage the site-visit calendar. Thirty to a hundred dollars a month, three logins, and the project history split across all three.
SPAN does those three in one account, free. Client records with your own fields — plot number, permit stage, whatever you actually track — invoices with what is paid and what is outstanding, and a calendar clients and contractors can book a visit in directly, with a reminder sent automatically.
The saving matters, but the version control matters more. When the client record, the invoice and the visit history sit together, "when did we issue that and has it been paid" stops being a question you have to research.
Visibly, software licences — a full CAD and BIM seat exceeds USD 2,000 a year. Invisibly, and usually larger, unpaid revision rounds: a fee quoted for one design and delivered after four is a quarter of the fee you agreed.
State the number of included revision rounds in the proposal and price the next one explicitly. Clients rarely object to a stated limit; they object to a surprise. Number and date every issued drawing so the agreed version is a fact.
Match seats to people who actually opened the software this quarter, check whether clients contractually need native files or a signed PDF, and diarise renewals so they are a decision rather than an automatic charge. Most practices of four can drop a seat unnoticed.
Yes. Payment at completion means financing the client out of your own working capital for the length of the project. Stages tied to deliverables — concept, permit submission, issue for construction — also reveal a non-paying client early rather than at the end.
SPAN provides client records with custom fields, invoicing with outstanding balances, and a booking calendar for site visits, free — covering the three admin subscriptions most practices pay for separately.